Paving located at the corner of Bridge City Boulevard and Nogwaja Street, the main mall entrance at Nogwaja Street, at the corner of Nogwaja and Bhejane Street and Bridge City Boulevard behind the Ntuzuma Magistrate Court have now been repaired. The repair was carried out by Green Africa over a five-day period from the 30th ย of May to the 5th of June 2018. The paving damage occurred because of the CCTV camera installation and now that the repairs are complete, and the paving is returned to its original condition, it is safe for use by all pedestrians.

