{"id":12256,"date":"2026-02-25T12:26:09","date_gmt":"2026-02-25T10:26:09","guid":{"rendered":"https:\/\/bridgecity.org.za\/site\/?p=12256"},"modified":"2026-02-25T12:26:09","modified_gmt":"2026-02-25T10:26:09","slug":"proactive-monitoring-5-faults-reported-and-resolved","status":"publish","type":"post","link":"https:\/\/bridgecity.org.za\/site\/proactive-monitoring-5-faults-reported-and-resolved\/","title":{"rendered":"Proactive Monitoring: 5 Faults Reported and Resolved"},"content":{"rendered":"<p>This month, the Bridge City precinct benefited from several key municipal interventions, with 5 faults being reported and resolved, ensuring the ongoing safety, functionality, and reliability of our infrastructure.<\/p>\n<h3><strong>Sewer Maintenance &amp; Unblocking<\/strong><\/h3>\n<p>During the month, an overflowing sewer was reported at the corner of Bhejane and Nogwaja Street. Teams from eThekwini Water and Sanitation (DWS) attended the site promptly, carrying out the necessary unblocking work to restore normal flow and prevent public health risks.<\/p>\n<p>Additionally, a DWS team addressed a blocked sewer on Indlanzi Lane, further supporting the smooth operation of the precinct\u2019s sewer network. These interventions highlight the importance of proactive monitoring and timely maintenance in keeping Bridge City\u2019s public spaces safe and fully operational.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-12258\" src=\"https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2026\/02\/BCMA-eTM-cable-repairs-300x225.png\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2026\/02\/BCMA-eTM-cable-repairs-300x225.png 300w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2026\/02\/BCMA-eTM-cable-repairs-600x450.png 600w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2026\/02\/BCMA-eTM-cable-repairs-768x576.png 768w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2026\/02\/BCMA-eTM-cable-repairs.png 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-12257\" src=\"https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2026\/02\/BCMA-eTM-drain-clearing-300x225.png\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2026\/02\/BCMA-eTM-drain-clearing-300x225.png 300w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2026\/02\/BCMA-eTM-drain-clearing-600x450.png 600w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2026\/02\/BCMA-eTM-drain-clearing-768x576.png 768w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2026\/02\/BCMA-eTM-drain-clearing.png 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<h3><strong>Electrical Infrastructure Repairs<\/strong><\/h3>\n<p>The precinct\u2019s electrical service provider was on site at Torvale Crescent, completing cable repairs to improve reliability and address intermittent faults. Maintaining functional and resilient electrical infrastructure is essential to supporting both businesses and public spaces within the precinct.<\/p>\n<h3><strong>Report faults<\/strong><\/h3>\n<p>We encourage all members of the community to report any infrastructure faults or service interruptions using the 24\/7 fault reporting system on our website, so that municipal teams can respond quickly and effectively: <a href=\"https:\/\/urbanmgt.my.site.com\/urbanmgt\/s\/\">https:\/\/urbanmgt.my.site.com\/urbanmgt\/s\/<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This month, the Bridge City precinct benefited from several key municipal interventions, with 5 faults being reported and resolved, ensuring the ongoing safety, functionality, and reliability of our infrastructure. Sewer Maintenance &amp; Unblocking During the month, an overflowing sewer was reported at the corner of Bhejane and Nogwaja Street. Teams from eThekwini Water and Sanitation&#8230;<\/p>\n","protected":false},"author":17,"featured_media":12259,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47],"tags":[303,306,102,309,304,237,308,245,291,311,307,292,312,313,305,310],"class_list":["post-12256","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-municipal-services","tag-bcm","tag-bhejane-street","tag-bridge-city","tag-electrical-cable-repairs","tag-ethekwini-dws","tag-ethekwini-municipality","tag-indlanzi-lane","tag-infrastructure-maintenance","tag-monthly-update","tag-municipal-services","tag-nogwaja-street","tag-precinct-safety","tag-public-safety","tag-service-delivery","tag-sewer-unblocking","tag-torvale-crescent"],"_links":{"self":[{"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/posts\/12256","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/comments?post=12256"}],"version-history":[{"count":1,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/posts\/12256\/revisions"}],"predecessor-version":[{"id":12260,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/posts\/12256\/revisions\/12260"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/media\/12259"}],"wp:attachment":[{"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/media?parent=12256"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/categories?post=12256"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/tags?post=12256"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}