{"id":11457,"date":"2023-08-16T09:51:32","date_gmt":"2023-08-16T07:51:32","guid":{"rendered":"https:\/\/bridgecity.org.za\/site\/?p=11457"},"modified":"2024-10-09T09:05:42","modified_gmt":"2024-10-09T07:05:42","slug":"all-goes-well-with-the-development-side-of-bridge-city","status":"publish","type":"post","link":"https:\/\/bridgecity.org.za\/site\/all-goes-well-with-the-development-side-of-bridge-city\/","title":{"rendered":"All goes well with the development side of Bridge City"},"content":{"rendered":"<p>On the construction side, we received positive reports from all our sites.<\/p>\n<p>This month the BCMA team also conducted a site handover on ERF 12 in the Bridge City Business Estate. The construction will be one of the smaller developments in the precinct and we envisage the project will take approximately 10 months to complete.<\/p>\n<p>Additionally, the columns on the Instratin site continue onwards and upwards as the team completes the 5<sup>th<\/sup> floor of the structure, with the building looking striking already.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-11459\" src=\"https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2023\/08\/Instratin-300x300.png\" alt=\"\" width=\"300\" height=\"300\" srcset=\"https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2023\/08\/Instratin-300x300.png 300w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2023\/08\/Instratin-150x150.png 150w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2023\/08\/Instratin-350x350.png 350w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2023\/08\/Instratin-600x600.png 600w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2023\/08\/Instratin-768x768.png 768w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2023\/08\/Instratin-100x100.png 100w, https:\/\/bridgecity.org.za\/site\/wp-content\/uploads\/2023\/08\/Instratin.png 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On the construction side, we received positive reports from all our sites. This month the BCMA team also conducted a site handover on ERF 12 in the Bridge City Business Estate. The construction will be one of the smaller developments in the precinct and we envisage the project will take approximately 10 months to complete&#8230;.<\/p>\n","protected":false},"author":14,"featured_media":11458,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[65],"tags":[],"class_list":["post-11457","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-community-and-sustainability"],"_links":{"self":[{"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/posts\/11457","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/comments?post=11457"}],"version-history":[{"count":1,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/posts\/11457\/revisions"}],"predecessor-version":[{"id":11460,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/posts\/11457\/revisions\/11460"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/media\/11458"}],"wp:attachment":[{"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/media?parent=11457"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/categories?post=11457"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bridgecity.org.za\/site\/wp-json\/wp\/v2\/tags?post=11457"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}